KOSTMOD 4.0 - user manual

Date Issued
2009
Keywords
Kostnadsberegning
Langtidsplanlegging
Project number
2009/01002
Permalink
http://hdl.handle.net/20.500.12242/2294
Collection
Rapporter
09-01002.pdf
Size: 1M
Abstract
KOSTMOD is a tool developed for conducting long term cost analyses. The tool has been developed by FFI since the 1970s. This report describes the latest version, Version 4.0, which has been developed in close co-operation with The University of Belgrade. The process of conducting a cost analysis using KOSTMOD can be divided into four main sub-processes. These processes are resource registration, department registration, plan registration and simulation. All relevant functionality related to these process is described in this report along side other functionality also present in KOSTMOD 4.0.
KOSTMOD er et verktøy for å gjennomføre langsiktige strukturkostnadsberegninger. Verktøyet har vært utviklet i regi av FFI siden 1970-tallet. Denne rapporten gir en innføring i den seneste versjonen, versjon 4.0, som har vært utviklet i samarbeid med Universitetet i Beograd. Prosessen med å gjennomføre en kostnadsberegning med bruk av KOSTMOD kan i hovedsak deles opp i fire delprosesser. Disse er registrering av ressursinformasjon, registrering av avdelingsinformasjon, registrering av plan og gjennomføring av simulering. All funksjonalitet knyttet til disse delprosessene blir beskrevet i denne rapporten. I tillegg beskrives også en del annen funksjonalitet i KOSTMOD 4.0.
View Meta Data